Water Resources Studies for Qeshm Island Small Towns

Project: Water Resources Studies for Qeshm Island Small Towns Client: Hormozgan Rural Water and Wastewater Background: Qeshm Island has experienced significant growth in both population and infrastructure, driving increased demand for fresh water. Local inland water resources are insufficient to meet this demand, and transferring water from the mainland has proven unfeasible. This study explored […]

Water Resources Studies of Assaluyeh Power Plant

Project: Water Resources Studies of Assaluyeh Power Plant Client: MAPNA Group Background: MAPNA Electricity Development Co. operated the Assaluyeh Gas Turbine Power Plant and planned to expand it to a combined cycle power plant, increasing output from 900 MW to 1,500 MW. MEWE was commissioned to assess water resource availability for the expansion. Actions: By […]

Water Resources Studies of 1001 Cities Theme Park

Project: Water Resources Studies of 1001 Cities Theme Park Client: Ezam Construction Investment Company Background: Ezam Investment Company planned the largest theme park in Iran, in western Tehran, incorporating recreational facilities, hotels (three- to five-star), shopping malls, and theaters. MEWE was tasked with conducting water resource studies for the project. Actions: Comprehensive field and desk […]

Groundwater Modeling of KhatoonAbad Plain

Project: Groundwater Modeling of KhatoonAbad Plain Client: National Iranian Copper Industries Company Background: The Khatoonabad Plains aquifer is the main raw water source for the Sarcheshmeh Copper Complex, though most of its extraction is for agriculture. Agricultural withdrawals are increasing, causing continuous groundwater table decline. Actions: Given the importance of the resource, MEWE engaged Gartner […]

MetOcean and Environmental Baseline Survey of Beheshti Port

Project: MetOcean and Environmental Baseline Survey of Beheshti Port Client: Ports and Maritime Organization Background: PMO planned major investments in expanding Beheshti Port at Chabahar Bay (Sea of Oman). MEWE was commissioned to conduct marine field measurements and an environmental baseline survey, with special focus on coral habitats. Actions: Two ADCP units equipped with directional […]

Maintenance Dredging Data Base for Iranian Ports

Project: Maintenance Dredging Data Base for Iranian Ports Client: Ports and Maritime Organization Background: PMO sought to create a comprehensive database of dredging operations for harbor basins and access channels in 12 operational ports along the Caspian Sea, Persian Gulf, and Sea of Oman. MEWE was engaged to gather, process, and organize the data. Actions: […]

Monitoring & Modeling of Makran Coastlines

Project: Monitoring & Modeling of Makran Coastlines Client: Ports and Maritime Organization Background: A national infrastructure program was initiated to study the climatology, geology, hydrodynamics, and geomorphology of Iran’s coastlines, providing a foundation for future development. Actions: MEWE modeled wind, wave, and current fields for the North Indian Ocean and the Sea of Oman, deriving […]

MetOcean Studies of Foruz B Sea Gas Pipeline

Project: MetOcean Studies of Foruz B Sea Gas Pipeline  Client: Mapna Oil & Gas Background: Mapna Oil & Gas planned a gas refinery on Qeshm Island, requiring reliable data for the design of a 160 km underwater pipeline from Foruz B Gas Platform to the island. MEWE carried out comprehensive field measurements to support engineering […]

Bathymetric Survey of Tailings Dams Decant Ponds

Project: Bathymetric Survey of Tailings Dams Decant Ponds Client: National Iranian Copper Industries Company Background: Under an ongoing contract with NICICo, MEWE conducts periodic surveys of tailings deposition patterns in the reservoirs of Sarcheshmeh, Miduk, and Sungun tailings dams. Actions: Bathymetric surveys of decant ponds are performed using echo-sounding equipment, while topographic surveys of tailings […]

Wide Body Aircrafts Maintenance Hangar

Project: Wide Body Aircrafts Maintenance Hangar Client: Mahan Airlines Background: Mahan Airlines sought to expand its aircraft maintenance capabilities by developing a new facility at Imam Khomeini International Airport in Tehran. MEWE was engaged, in association with KenTech, to undertake the design development and facilitate know-how transfer. Actions: Kencana Technologies, a specialist in aircraft hangar […]

Iran National Copper Industries Company

1. Upgrading the tailings drainage and water supply system of Sarcheshme Copper
2. Field monitoring and measurement of tailings movement in Midok
3. Hydrographic operation of Sarcheshme tailings dam reservoir
4. Improvement of concrete cover of coarse soil storage
5. As Built maps of the water supply system
6. Control and monitoring of water master plan plants
7. Groundwater studies of Khatunabad plain
8. Management of water and tailings of Navchun and Darehazar mine
9. Managing the construction project of Kerman, Rafsanjan and Shahrbabak stadiums
10. Feasibility studies of copper downstream industries
11. Seismic studies, rock mechanics and geotechnics of Darezar concentrator factory
12. Update of underground water studies of Khatunabad plain and Shahrbabak plain
13. Persian Gulf water transmission line and pumping station

1. Upgrading the tailings drainage and water supply system of Midok Copper
2. Studies of water resources and tailings accumulation of Aliabad copper mine
3. Studies of the second phase of Sarchesheme copper concentration development
4. High-level and workshop supervision of the Midok Sedimentation Dam (continuation of 8501)
5. Location studies of Songun copper leaching plant construction project
6. National Administrative and Commercial Tower of Iran’s Copper Industries
7. Water and tailings management of Chelkore mine in Zahedan
8. Copper slag concentrate water and waste management
9. Management of water and tailings of Dareh Alu mine
10. Conducting meteorology and hydrology studies in the area of mines and concentrate factories of Chafirozeh and Ijo
11. Construction of Kerman Stadium
12. Continuation of the water master plan of Sarcheshme Copper Complex, Dere Zar, Shahrbabak, Daralo
13. Improvement of the main water supply network of Sarcheshme copper complex