Project: Kerman Airport New Passenger Terminal Client: Iran Airports and Air Navigation Company Background: IAC initiated plans for the further development of the new passenger terminal at Kerman Airport, aiming to increase both service capacity and operational efficiency. MEWE’s role was to collaborate with and assist Società per Azioni Esercizi Aeroportuali (Italy) in delivering the […]

Project: Flight Catering Building and Installations Client: Mahan Airlines Background: To establish new in-flight catering capabilities at its Kerman Airport base, Mahan Airlines planned the construction of a facility with a production capacity of 3,000 meals per day. MEWE was appointed to undertake all stages of engineering design as well as construction supervision. Actions: Drawing […]

Project: Revamping of  Apron and Taxiway, Larestan Airport Client: Iran Airports and Air Navigation Company Background: Iran Airports Company planned to revamp the existing apron and taxiway at Larestan Airport in Fars Province. While the engineering design phase had already been completed, the contract for Contractor’s Technical Assistance and Construction Supervision was awarded to MEWE […]

Project: Sand and Water Ditching Training Facilities  Client: Mahan Airlines Background: To enhance flight attendant training for emergency situations—such as evacuation from a sinking aircraft or survival after a desert landing—Mahan Airlines planned the construction of combined water pool and sand pool facilities at its Kerman Airport base. MEWE was appointed to carry out the […]

Project: Flight Catering Building and Installations Client: Arman Flight Catering Background: To expand its catering services in Tehran, Arman Catering Company planned the addition of an annex building to its existing facilities. MEWE was appointed to carry out the design and construction supervision for this brownfield project. The design was developed in accordance with both […]

Project: Flight Simulator Building and Installations Client: Mahan Airlines Background: Having already established a Pilot Training Center with three operating flight simulators, Mahan Air decided to expand the facility by adding new installations for three additional cockpits. Building on its previous work for the earlier simulator facilities, MEWE was once again appointed to carry out […]

Project: Concentrator Plant Expansion of Sarcheshmeh Copper Mine Client: National Iranian Copper Industries Company Background: NICICo initiated plans to increase concentrate production at the Sarcheshmeh Copper Complex as part of the plant’s Phase II expansion. In this project, MEWE served as the engineering design reviewer for the EPC contractors and provided construction supervision. Actions: MEWE […]

Project: 12,000 TPA Copper Tube Production Plant  Client: Iranian Babak Copper Company Background: IBCCO, a major subsidiary of MIDHCO, developed a copper tube and pipe production plant in Shahr Babak, in central-eastern Iran, targeting both domestic and export markets. The plant employed state-of-the-art European Upcast technology as its core process. Actions: MEWE managed the full […]

Project: Ore Bioleaching Site Allocation for Sungun Copper Mine Client: National Iranian Copper Industries Company Background: The Sungun Copper Mine in north-west Iran planned to extract copper cathode from its oxide ore reserves via a bioleaching process. Previous studies had confirmed both the technical and financial feasibility of the project. MEWE was appointed to conduct […]

Project: Silicon Steel Plate Production, Feasibility Study Client: Petropart Industrial Projects Company Background: Silicon steel plates, known for their high magnetic properties and low energy dissipation, were at the time fully imported into Iran. The feasibility study focused on a detailed Iranian market analysis, comparison of local production costs versus import costs, and identification of […]

Iran National Copper Industries Company

1. Upgrading the tailings drainage and water supply system of Sarcheshme Copper
2. Field monitoring and measurement of tailings movement in Midok
3. Hydrographic operation of Sarcheshme tailings dam reservoir
4. Improvement of concrete cover of coarse soil storage
5. As Built maps of the water supply system
6. Control and monitoring of water master plan plants
7. Groundwater studies of Khatunabad plain
8. Management of water and tailings of Navchun and Darehazar mine
9. Managing the construction project of Kerman, Rafsanjan and Shahrbabak stadiums
10. Feasibility studies of copper downstream industries
11. Seismic studies, rock mechanics and geotechnics of Darezar concentrator factory
12. Update of underground water studies of Khatunabad plain and Shahrbabak plain
13. Persian Gulf water transmission line and pumping station

1. Upgrading the tailings drainage and water supply system of Midok Copper
2. Studies of water resources and tailings accumulation of Aliabad copper mine
3. Studies of the second phase of Sarchesheme copper concentration development
4. High-level and workshop supervision of the Midok Sedimentation Dam (continuation of 8501)
5. Location studies of Songun copper leaching plant construction project
6. National Administrative and Commercial Tower of Iran’s Copper Industries
7. Water and tailings management of Chelkore mine in Zahedan
8. Copper slag concentrate water and waste management
9. Management of water and tailings of Dareh Alu mine
10. Conducting meteorology and hydrology studies in the area of mines and concentrate factories of Chafirozeh and Ijo
11. Construction of Kerman Stadium
12. Continuation of the water master plan of Sarcheshme Copper Complex, Dere Zar, Shahrbabak, Daralo
13. Improvement of the main water supply network of Sarcheshme copper complex