Project: EIA of DBM production in Salt Lake Client: Mining Industries Development Holding Company Background: The objective of one study was to assess the environmental impact of proposed magnesium oxide and sodium chloride extraction facilities at Namak Lake, near Aran & Bidgol County, Iran. This assessment formed part of a feasibility study conducted under the […]

Project: Geotechnical Studies of DareZar copper Concentrator Plant  Client: National Iranian Copper Industries Company Background: Separately, NICICo planned to develop the new Dareh Zar Copper Mine and construct a 10.5 MTPA concentrator plant. Geological and geotechnical investigations for the proposed plant site were awarded to MEWE, which carried out the studies in joint venture with […]

Project: Pilgrims Guest House Complex for Karbala Holy Shrine Client: Reconstruction Organization of Holy Shrines in Iraq Background: Karbala, a city built around the holy shrine of Imam Hussein, has undergone numerous renovations over the centuries. The most recent major renovation began in the early 2000s and included the construction of a Multipurpose Pilgrims Complex. […]

Project: Renovation of the National Water Treasure Museum  Client: Iran Water Resources Management Background: Among the honors of Iranian civilization are its highly efficient water collection, transfer, and distribution techniques, developed and perfected over the past 2,500 years. The Museum of National Water Treasures was conceived to showcase the evolution of these techniques across the […]

Project: Sadra University Campus Client: Sadra University Background: Established in 2002 and located in the far west of Tehran, Sadra University began its operations by offering college degrees in science and technology. As the university continued its steady growth, it expanded its programs to include BSc degrees and developed multiple faculties. This rapid expansion created […]

Project: Kerman Province Sport Complexes Client: National Iranian Copper Industries Company Background: The cities of Kerman, Rafsanjan, and Shahr-Babak have long-standing ties with NICICo, the largest mineral industry in the province. As part of its social responsibility initiatives, NICICo undertook the construction of major sports complexes in these cities. MEWE was appointed as the project’s […]

Project: NICICo New Office Tower Client: National Iranian Copper Industries Company Background: NICICo was evaluating two options for its Tehran headquarters: renovating its existing building or constructing a new one. For the new construction option, MEWE was appointed to carry out the Conceptual Design phase. The work was undertaken by a joint venture between MEWE […]

CMS55 FAG (Iran)

GF- 300 A&D (JAPAN)

Iran National Copper Industries Company

1. Upgrading the tailings drainage and water supply system of Sarcheshme Copper
2. Field monitoring and measurement of tailings movement in Midok
3. Hydrographic operation of Sarcheshme tailings dam reservoir
4. Improvement of concrete cover of coarse soil storage
5. As Built maps of the water supply system
6. Control and monitoring of water master plan plants
7. Groundwater studies of Khatunabad plain
8. Management of water and tailings of Navchun and Darehazar mine
9. Managing the construction project of Kerman, Rafsanjan and Shahrbabak stadiums
10. Feasibility studies of copper downstream industries
11. Seismic studies, rock mechanics and geotechnics of Darezar concentrator factory
12. Update of underground water studies of Khatunabad plain and Shahrbabak plain
13. Persian Gulf water transmission line and pumping station

1. Upgrading the tailings drainage and water supply system of Midok Copper
2. Studies of water resources and tailings accumulation of Aliabad copper mine
3. Studies of the second phase of Sarchesheme copper concentration development
4. High-level and workshop supervision of the Midok Sedimentation Dam (continuation of 8501)
5. Location studies of Songun copper leaching plant construction project
6. National Administrative and Commercial Tower of Iran’s Copper Industries
7. Water and tailings management of Chelkore mine in Zahedan
8. Copper slag concentrate water and waste management
9. Management of water and tailings of Dareh Alu mine
10. Conducting meteorology and hydrology studies in the area of mines and concentrate factories of Chafirozeh and Ijo
11. Construction of Kerman Stadium
12. Continuation of the water master plan of Sarcheshme Copper Complex, Dere Zar, Shahrbabak, Daralo
13. Improvement of the main water supply network of Sarcheshme copper complex