Organizations that placed their Trust in us

Organizations that placed their Trust in Us

Projects done for this employer

1. Upgrading the waste disposal and water supply system of Sarchesheme copper
2. Field monitoring and measurement of tailings movement in Midok
3. Hydrographic operations of Sarcheshme tailings reservoir.
View the website

National Iranian Copper Industries Company

Projects done for this employer

1. Asia water workshop monitoring
2. Asia water workshop monitoring
3. Pathology of the country's marine catchment basins
View the website

Asia Water Development Company

Projects done for this employer

1. Construction of Mahan airplane hangar
2. Designing and supervising the implementation of Kerman airport hangar
3. Mahan flight simulators at Kerman airport
View the website

Mahan airways

Projects done for this employer

1.Studies of the first and second stages of Qeshm desalination plant
2. Azad Qeshm fresh water (preparation of tender documents)
3. Engineering services and supervision of desalination design, purchase and implementation
view the details...

Qeshm water and electricity facilities

Projects done for this employer

1. Optimizing water consumption and supply of Asalouye power plant
2. Marine measurement and modeling of Froze gas field
View the website

Mapna Co

Projects done for this employer

1. Maritime measurements of Shahid Beheshti port
2. Supervise the measurements of the Chabahar Monitoring Project
3. Sedimentation of ports (database)
View the website

Ports and Maritime Organization

Projects done for this employer

1. Opportunistic studies of hydrometallurgy method in copper production
2. Feasibility study of the development of downstream copper industries
View the website

Middle East Mines and Mineral Industries Development Holding (MIDCO)

Projects done for this employer

1. Feasibility assessment of water desalination in Kohstak city
2. Feasibility studies of Mahshahr fresh water, electricity and salt production project
View the website

Imran Makran Company

Projects done for this employer

1. Repairing the overflow concrete of Karkheh Dam and Dasht Abbas Tunnel
2. Studies on the improvement of Pardisan Park Water Museum
View the website

Iran Water Resources Management Company

Projects done for this employer

1. Tehran Park
View the website

Azam Investment Company

Projects done for this employer

1. Improvement of access roads to the marginal forest
View the website

Tehran Oil Refining Company

Projects done for this employer

1. Engineering design studies of middle molybdenum complex
View the website

Arya Kansar Sameen Company

Projects done for this employer

1. Supervising the implementation of the facade of the central building
2. Improvement of the existing apron and communication taxi (Larestan Airport).
View the website

Iran Airports and Air Navigation Company

Projects done for this employer

1. Sweeten the water of Bandar Khamir
View the website

Construction Company

Projects done for this employer

1. Hormozgan cement water softener in 1986
2. Hormozgan cement water softener in 1998
3. Studies on the construction of a 3000 cubic meter desalination plant
View the website

Hormozgan cement

Projects done for this employer

1. Feasibility studies of urea fertilizer production with sulfur coating
View the website

Zarin Kod Co

Projects done for this employer

1. Workshop supervision and technical office of Karbala projects
2. Service and maintenance of the facilities of Seyyed al-Shahada Assembly in Karbala
View the website

Headquarters for the reconstruction of Atbat Aliayat

Projects done for this employer

1. Architectural design of Sadra University
View the website

Sadra University

Projects done for this employer

1. Environmental studies of the construction site of Iran Tire rubber factory
2. Feasibility studies of building a rubber factory
View the website

Iran Tire Company

Projects done for this employer

1. Tehran catering development
View the website

Arman Air Catering Company

Projects done for this employer

1. Repairing the overflow concrete of Karkheh Dam and Dasht Abbas Tunnel
2. Studies on the improvement of Pardisan Park Water Museum
View the website

Iran Water Resources Management Company

Projects done for this employer

1. Fajr Safa slaughterhouse and morgue
View the website

Fajrsfa agriculture and industry

Projects done for this employer

1.................................. 2.................................. 3..................................
View the website

Petropart Co

Projects done for this employer

1. Upgrading the waste disposal and water supply system of Sarchesheme copper
2. Field monitoring and measurement of tailings movement in Midok
3. Hydrographic operations of Sarcheshme tailings reservoir
View the website

Iran's National Copper Industry Company, Middle East Holding Company

شرکت صنایع ملی مس ایران

پروژه انجام شده یک

پروژه انجام شده دو

پروژه انجام شده سه

پروژه انجام شده چهار

پروژه انجام شده پنج

پروژه انجام شده شش

پروژه انجام شده هفت

پروژه انجام شده هشت

Qeshm water and electricity facilities

Studies of the first and second stages of Qeshm desalination plant

Azad Qeshm fresh water (preparation of tender documents)

Engineering services and supervision of desalination design, purchase and implementation

Engineering and monitoring services of the 10,000 cubic meter desalination plant in Qeshm

Water supply studies of three rural complexes of Dehtal – Bestak, Goran (West Qeshm) and Turgan Qeshm

Iran National Copper Industries Company

1. Upgrading the tailings drainage and water supply system of Sarcheshme Copper
2. Field monitoring and measurement of tailings movement in Midok
3. Hydrographic operation of Sarcheshme tailings dam reservoir
4. Improvement of concrete cover of coarse soil storage
5. As Built maps of the water supply system
6. Control and monitoring of water master plan plants
7. Groundwater studies of Khatunabad plain
8. Management of water and tailings of Navchun and Darehazar mine
9. Managing the construction project of Kerman, Rafsanjan and Shahrbabak stadiums
10. Feasibility studies of copper downstream industries
11. Seismic studies, rock mechanics and geotechnics of Darezar concentrator factory
12. Update of underground water studies of Khatunabad plain and Shahrbabak plain
13. Persian Gulf water transmission line and pumping station

1. Upgrading the tailings drainage and water supply system of Midok Copper
2. Studies of water resources and tailings accumulation of Aliabad copper mine
3. Studies of the second phase of Sarchesheme copper concentration development
4. High-level and workshop supervision of the Midok Sedimentation Dam (continuation of 8501)
5. Location studies of Songun copper leaching plant construction project
6. National Administrative and Commercial Tower of Iran’s Copper Industries
7. Water and tailings management of Chelkore mine in Zahedan
8. Copper slag concentrate water and waste management
9. Management of water and tailings of Dareh Alu mine
10. Conducting meteorology and hydrology studies in the area of mines and concentrate factories of Chafirozeh and Ijo
11. Construction of Kerman Stadium
12. Continuation of the water master plan of Sarcheshme Copper Complex, Dere Zar, Shahrbabak, Daralo
13. Improvement of the main water supply network of Sarcheshme copper complex