FA

خدمات و پروژه ها

شرکت مهندسین مشاور آب و محیط خاورمیانه

Basic studies and design of tailings accumulation of turpentine gold processing project

Qalqele gold mine has 71 million tons of proven reserves with a grade of 7.1 grams per ton. Development company

Kurdistan gold mines plan to process 111 thousand tons of ore in 71 years.

have given. The product waste is a dry cake type, which after the filter press should be stored in the waste storage

The face of the dry mass should be piled up. For waste accumulation due to less than 01 ppm of cyanide in the waste,

There is a need for a place that is in a favorable condition in terms of location, slope and environmental issues

should be isolated. Consultant services include basic studies (meteorology, hydrology, geology

and geotechnics) and basic and detailed design of waste substructure, dry mass, transfer system and accumulation of waste,

Water diversion channels, collection channel and contaminated water tank and return water transfer system to

It is a factory.

Iran National Copper Industries Company

1. Upgrading the tailings drainage and water supply system of Sarcheshme Copper
2. Field monitoring and measurement of tailings movement in Midok
3. Hydrographic operation of Sarcheshme tailings dam reservoir
4. Improvement of concrete cover of coarse soil storage
5. As Built maps of the water supply system
6. Control and monitoring of water master plan plants
7. Groundwater studies of Khatunabad plain
8. Management of water and tailings of Navchun and Darehazar mine
9. Managing the construction project of Kerman, Rafsanjan and Shahrbabak stadiums
10. Feasibility studies of copper downstream industries
11. Seismic studies, rock mechanics and geotechnics of Darezar concentrator factory
12. Update of underground water studies of Khatunabad plain and Shahrbabak plain
13. Persian Gulf water transmission line and pumping station

1. Upgrading the tailings drainage and water supply system of Midok Copper
2. Studies of water resources and tailings accumulation of Aliabad copper mine
3. Studies of the second phase of Sarchesheme copper concentration development
4. High-level and workshop supervision of the Midok Sedimentation Dam (continuation of 8501)
5. Location studies of Songun copper leaching plant construction project
6. National Administrative and Commercial Tower of Iran’s Copper Industries
7. Water and tailings management of Chelkore mine in Zahedan
8. Copper slag concentrate water and waste management
9. Management of water and tailings of Dareh Alu mine
10. Conducting meteorology and hydrology studies in the area of mines and concentrate factories of Chafirozeh and Ijo
11. Construction of Kerman Stadium
12. Continuation of the water master plan of Sarcheshme Copper Complex, Dere Zar, Shahrbabak, Daralo
13. Improvement of the main water supply network of Sarcheshme copper complex