Projects & Services

Seawater Desalination Plant, Hormozgan Cement Plant, 4000 m3/day

Project: Seawater Desalination Plant, Hormozgan Cement Plant, 4000 m3/day

Client: Hormozgan Cement Company

Background: Hormozgan Cement Factory, located along the Persian Gulf coastline, sought to secure an additional water source to supplement its existing supply. The company awarded the design of a 4,000 m³/day SWRO desalination plant to Marine System Technologists Ltd., while the review of the Basic and Detailed Design Documents was assigned to MEWE.

Actions: Working in close collaboration with the designer, MEWE reviewed and provided feedback on all key disciplines, including process, mechanical, electrical, instrumentation, civil, structural, architectural, geological, and environmental aspects. These comments were discussed and finalized in technical meetings with both the client and the consultant.

Results: The intake structure was identified as the most critical component of the project. Due to the high cost of laying intake pipes from a depth of –10 m to the intake basin, and considering the geological conditions of the shoreline, MEWE emphasized the need for further supplementary investigations into the feasibility of using beach wells as an alternative seawater intake method.

Iran National Copper Industries Company

1. Upgrading the tailings drainage and water supply system of Sarcheshme Copper
2. Field monitoring and measurement of tailings movement in Midok
3. Hydrographic operation of Sarcheshme tailings dam reservoir
4. Improvement of concrete cover of coarse soil storage
5. As Built maps of the water supply system
6. Control and monitoring of water master plan plants
7. Groundwater studies of Khatunabad plain
8. Management of water and tailings of Navchun and Darehazar mine
9. Managing the construction project of Kerman, Rafsanjan and Shahrbabak stadiums
10. Feasibility studies of copper downstream industries
11. Seismic studies, rock mechanics and geotechnics of Darezar concentrator factory
12. Update of underground water studies of Khatunabad plain and Shahrbabak plain
13. Persian Gulf water transmission line and pumping station

1. Upgrading the tailings drainage and water supply system of Midok Copper
2. Studies of water resources and tailings accumulation of Aliabad copper mine
3. Studies of the second phase of Sarchesheme copper concentration development
4. High-level and workshop supervision of the Midok Sedimentation Dam (continuation of 8501)
5. Location studies of Songun copper leaching plant construction project
6. National Administrative and Commercial Tower of Iran’s Copper Industries
7. Water and tailings management of Chelkore mine in Zahedan
8. Copper slag concentrate water and waste management
9. Management of water and tailings of Dareh Alu mine
10. Conducting meteorology and hydrology studies in the area of mines and concentrate factories of Chafirozeh and Ijo
11. Construction of Kerman Stadium
12. Continuation of the water master plan of Sarcheshme Copper Complex, Dere Zar, Shahrbabak, Daralo
13. Improvement of the main water supply network of Sarcheshme copper complex