Project: Sand and Water Ditching Training Facilities 

Client: Mahan Airlines

Background: To enhance flight attendant training for emergency situations—such as evacuation from a sinking aircraft or survival after a desert landing—Mahan Airlines planned the construction of combined water pool and sand pool facilities at its Kerman Airport base. MEWE was appointed to carry out the design and provide construction supervision for the project.

Actions: International codes, manuals, and guidelines for civil aviation training facilities were thoroughly reviewed. In addition, input from the client’s Training Department instructors was gathered and incorporated throughout the conceptual, basic, and detailed design stages. Construction supervision was conducted in close coordination with the Training Department staff through regular interactions and correspondence.

Results: The L-shaped pool measures 45 × 20 meters with an average depth of 2.5 meters, with a sand pool positioned directly adjacent. Supporting infrastructure includes a below-ground water treatment plant, showers and bathrooms for post-training use, dedicated equipment storage, and reinforced pavement capable of supporting the wheels of an Airbus A300-B4.

Iran National Copper Industries Company

1. Upgrading the tailings drainage and water supply system of Sarcheshme Copper
2. Field monitoring and measurement of tailings movement in Midok
3. Hydrographic operation of Sarcheshme tailings dam reservoir
4. Improvement of concrete cover of coarse soil storage
5. As Built maps of the water supply system
6. Control and monitoring of water master plan plants
7. Groundwater studies of Khatunabad plain
8. Management of water and tailings of Navchun and Darehazar mine
9. Managing the construction project of Kerman, Rafsanjan and Shahrbabak stadiums
10. Feasibility studies of copper downstream industries
11. Seismic studies, rock mechanics and geotechnics of Darezar concentrator factory
12. Update of underground water studies of Khatunabad plain and Shahrbabak plain
13. Persian Gulf water transmission line and pumping station

1. Upgrading the tailings drainage and water supply system of Midok Copper
2. Studies of water resources and tailings accumulation of Aliabad copper mine
3. Studies of the second phase of Sarchesheme copper concentration development
4. High-level and workshop supervision of the Midok Sedimentation Dam (continuation of 8501)
5. Location studies of Songun copper leaching plant construction project
6. National Administrative and Commercial Tower of Iran’s Copper Industries
7. Water and tailings management of Chelkore mine in Zahedan
8. Copper slag concentrate water and waste management
9. Management of water and tailings of Dareh Alu mine
10. Conducting meteorology and hydrology studies in the area of mines and concentrate factories of Chafirozeh and Ijo
11. Construction of Kerman Stadium
12. Continuation of the water master plan of Sarcheshme Copper Complex, Dere Zar, Shahrbabak, Daralo
13. Improvement of the main water supply network of Sarcheshme copper complex