Revamping of Apron and Taxiway, Larestan Airport

Project: Revamping of  Apron and Taxiway, Larestan Airport

Client: Iran Airports and Air Navigation Company

Background: Iran Airports Company planned to revamp the existing apron and taxiway at Larestan Airport in Fars Province. While the engineering design phase had already been completed, the contract for Contractor’s Technical Assistance and Construction Supervision was awarded to MEWE through a competitive tender process.

Actions: In line with standard construction supervision practices in Iran, MEWE’s activities focused on controlling project timelines in accordance with the approved Master Plan; inspecting and verifying the quality of purchased materials; supervising geotechnical site work and laboratory testing; ensuring quality and quantity control of construction activities; and managing the project’s technical and administrative documentation.

Results: The works included the construction of a new apron measuring 150 × 155 meters, paved with a 35 cm-thick reinforced-free concrete layer. The existing taxiway was widened from 15 meters to 25 meters. Additionally, a new 350-meter-long access road was constructed to connect the recently completed passenger terminal to the new apron.

Iran National Copper Industries Company

1. Upgrading the tailings drainage and water supply system of Sarcheshme Copper
2. Field monitoring and measurement of tailings movement in Midok
3. Hydrographic operation of Sarcheshme tailings dam reservoir
4. Improvement of concrete cover of coarse soil storage
5. As Built maps of the water supply system
6. Control and monitoring of water master plan plants
7. Groundwater studies of Khatunabad plain
8. Management of water and tailings of Navchun and Darehazar mine
9. Managing the construction project of Kerman, Rafsanjan and Shahrbabak stadiums
10. Feasibility studies of copper downstream industries
11. Seismic studies, rock mechanics and geotechnics of Darezar concentrator factory
12. Update of underground water studies of Khatunabad plain and Shahrbabak plain
13. Persian Gulf water transmission line and pumping station

1. Upgrading the tailings drainage and water supply system of Midok Copper
2. Studies of water resources and tailings accumulation of Aliabad copper mine
3. Studies of the second phase of Sarchesheme copper concentration development
4. High-level and workshop supervision of the Midok Sedimentation Dam (continuation of 8501)
5. Location studies of Songun copper leaching plant construction project
6. National Administrative and Commercial Tower of Iran’s Copper Industries
7. Water and tailings management of Chelkore mine in Zahedan
8. Copper slag concentrate water and waste management
9. Management of water and tailings of Dareh Alu mine
10. Conducting meteorology and hydrology studies in the area of mines and concentrate factories of Chafirozeh and Ijo
11. Construction of Kerman Stadium
12. Continuation of the water master plan of Sarcheshme Copper Complex, Dere Zar, Shahrbabak, Daralo
13. Improvement of the main water supply network of Sarcheshme copper complex