Projects & Services

MetOcean Studies of Foruz B Sea Gas Pipeline

Project: MetOcean Studies of Foruz B Sea Gas Pipeline 

Client: Mapna Oil & Gas

Background: Mapna Oil & Gas planned a gas refinery on Qeshm Island, requiring reliable data for the design of a 160 km underwater pipeline from Foruz B Gas Platform to the island. MEWE carried out comprehensive field measurements to support engineering design.

Actions: The program included bottom-mounted ADCP devices, vessel-based current profilers, and meteorological monitoring for wind, air temperature, humidity, rainfall, and pressure. Data on currents, waves, tides, surges, marine growth, and seawater properties were collected.

Results: These results informed 2DH hydrodynamic modeling, which provided calibrated design parameters for both basic and detailed design stages.

Iran National Copper Industries Company

1. Upgrading the tailings drainage and water supply system of Sarcheshme Copper
2. Field monitoring and measurement of tailings movement in Midok
3. Hydrographic operation of Sarcheshme tailings dam reservoir
4. Improvement of concrete cover of coarse soil storage
5. As Built maps of the water supply system
6. Control and monitoring of water master plan plants
7. Groundwater studies of Khatunabad plain
8. Management of water and tailings of Navchun and Darehazar mine
9. Managing the construction project of Kerman, Rafsanjan and Shahrbabak stadiums
10. Feasibility studies of copper downstream industries
11. Seismic studies, rock mechanics and geotechnics of Darezar concentrator factory
12. Update of underground water studies of Khatunabad plain and Shahrbabak plain
13. Persian Gulf water transmission line and pumping station

1. Upgrading the tailings drainage and water supply system of Midok Copper
2. Studies of water resources and tailings accumulation of Aliabad copper mine
3. Studies of the second phase of Sarchesheme copper concentration development
4. High-level and workshop supervision of the Midok Sedimentation Dam (continuation of 8501)
5. Location studies of Songun copper leaching plant construction project
6. National Administrative and Commercial Tower of Iran’s Copper Industries
7. Water and tailings management of Chelkore mine in Zahedan
8. Copper slag concentrate water and waste management
9. Management of water and tailings of Dareh Alu mine
10. Conducting meteorology and hydrology studies in the area of mines and concentrate factories of Chafirozeh and Ijo
11. Construction of Kerman Stadium
12. Continuation of the water master plan of Sarcheshme Copper Complex, Dere Zar, Shahrbabak, Daralo
13. Improvement of the main water supply network of Sarcheshme copper complex