Projects & Services

Kerman Province Sport Complexes

Project: Kerman Province Sport Complexes

Client: National Iranian Copper Industries Company

Background: The cities of Kerman, Rafsanjan, and Shahr-Babak have long-standing ties with NICICo, the largest mineral industry in the province. As part of its social responsibility initiatives, NICICo undertook the construction of major sports complexes in these cities. MEWE was appointed as the project’s Managing Consultant and Construction Supervisor.

Actions: In its role as Project Management Consultant, MEWE reviewed, commented on, and approved the designers’ reports and drawings. In later stages, during construction, MEWE was again engaged—this time as the construction supervisor for the Kerman Sports Complex, the largest of the three facilities.

Results: The three sports complexes, each centered around football stadiums with seating capacities of 35,000 and 10,000 spectators, were built in the key cities of Kerman Province. Architectural designs incorporated elements inspired by the ancient cultural heritage of eastern Iran, while the complexes were equipped with modern infrastructure and state-of-the-art facilities.

Iran National Copper Industries Company

1. Upgrading the tailings drainage and water supply system of Sarcheshme Copper
2. Field monitoring and measurement of tailings movement in Midok
3. Hydrographic operation of Sarcheshme tailings dam reservoir
4. Improvement of concrete cover of coarse soil storage
5. As Built maps of the water supply system
6. Control and monitoring of water master plan plants
7. Groundwater studies of Khatunabad plain
8. Management of water and tailings of Navchun and Darehazar mine
9. Managing the construction project of Kerman, Rafsanjan and Shahrbabak stadiums
10. Feasibility studies of copper downstream industries
11. Seismic studies, rock mechanics and geotechnics of Darezar concentrator factory
12. Update of underground water studies of Khatunabad plain and Shahrbabak plain
13. Persian Gulf water transmission line and pumping station

1. Upgrading the tailings drainage and water supply system of Midok Copper
2. Studies of water resources and tailings accumulation of Aliabad copper mine
3. Studies of the second phase of Sarchesheme copper concentration development
4. High-level and workshop supervision of the Midok Sedimentation Dam (continuation of 8501)
5. Location studies of Songun copper leaching plant construction project
6. National Administrative and Commercial Tower of Iran’s Copper Industries
7. Water and tailings management of Chelkore mine in Zahedan
8. Copper slag concentrate water and waste management
9. Management of water and tailings of Dareh Alu mine
10. Conducting meteorology and hydrology studies in the area of mines and concentrate factories of Chafirozeh and Ijo
11. Construction of Kerman Stadium
12. Continuation of the water master plan of Sarcheshme Copper Complex, Dere Zar, Shahrbabak, Daralo
13. Improvement of the main water supply network of Sarcheshme copper complex