Flight Simulator Building and Installations

Project: Flight Simulator Building and Installations

Client: Mahan Airlines

Background: Having already established a Pilot Training Center with three operating flight simulators, Mahan Air decided to expand the facility by adding new installations for three additional cockpits. Building on its previous work for the earlier simulator facilities, MEWE was once again appointed to carry out all design stages and construction supervision for the new development.

Actions: The design included a cockpit installation hall of approximately 750 m², with overall dimensions of 42 × 18 meters and an average height of 15 meters. Key utilities provided include air handling units, chillers, and a dedicated 1 MVA electrical power supply. The design also optimized the use of existing infrastructure wherever possible.

Results: Adjacent to the cockpit hall, a two-story annex building with dimensions of 48 × 12 meters and a total area of 1,150 m² was planned. The basement accommodates three hydraulic rooms, while the upper floors house control rooms, a library, training classrooms, and a public lounge.

Iran National Copper Industries Company

1. Upgrading the tailings drainage and water supply system of Sarcheshme Copper
2. Field monitoring and measurement of tailings movement in Midok
3. Hydrographic operation of Sarcheshme tailings dam reservoir
4. Improvement of concrete cover of coarse soil storage
5. As Built maps of the water supply system
6. Control and monitoring of water master plan plants
7. Groundwater studies of Khatunabad plain
8. Management of water and tailings of Navchun and Darehazar mine
9. Managing the construction project of Kerman, Rafsanjan and Shahrbabak stadiums
10. Feasibility studies of copper downstream industries
11. Seismic studies, rock mechanics and geotechnics of Darezar concentrator factory
12. Update of underground water studies of Khatunabad plain and Shahrbabak plain
13. Persian Gulf water transmission line and pumping station

1. Upgrading the tailings drainage and water supply system of Midok Copper
2. Studies of water resources and tailings accumulation of Aliabad copper mine
3. Studies of the second phase of Sarchesheme copper concentration development
4. High-level and workshop supervision of the Midok Sedimentation Dam (continuation of 8501)
5. Location studies of Songun copper leaching plant construction project
6. National Administrative and Commercial Tower of Iran’s Copper Industries
7. Water and tailings management of Chelkore mine in Zahedan
8. Copper slag concentrate water and waste management
9. Management of water and tailings of Dareh Alu mine
10. Conducting meteorology and hydrology studies in the area of mines and concentrate factories of Chafirozeh and Ijo
11. Construction of Kerman Stadium
12. Continuation of the water master plan of Sarcheshme Copper Complex, Dere Zar, Shahrbabak, Daralo
13. Improvement of the main water supply network of Sarcheshme copper complex