Projects & Services

Flight Catering Building and Installations

Project: Flight Catering Building and Installations

Client: Mahan Airlines

Background: To establish new in-flight catering capabilities at its Kerman Airport base, Mahan Airlines planned the construction of a facility with a production capacity of 3,000 meals per day. MEWE was appointed to undertake all stages of engineering design as well as construction supervision.

Actions: Drawing on its prior experience in expanding Arman Company’s catering facilities in Tehran, MEWE was able to advance this new greenfield project at a relatively fast pace. Multiple technical meetings were held with the future operations and maintenance teams, who also provided input for the process engineering disciplines. The design complied with both local and international standards.

Results: The facility consists of a two-story reinforced concrete building with a total floor area of 1,850 m² and overall dimensions of 50 × 25 meters. Major utilities include air handling units, air washers, and compressors. The operation is designed to produce 3,000 meals per day, with staffing provisions for approximately 60 personnel per working shift.

Iran National Copper Industries Company

1. Upgrading the tailings drainage and water supply system of Sarcheshme Copper
2. Field monitoring and measurement of tailings movement in Midok
3. Hydrographic operation of Sarcheshme tailings dam reservoir
4. Improvement of concrete cover of coarse soil storage
5. As Built maps of the water supply system
6. Control and monitoring of water master plan plants
7. Groundwater studies of Khatunabad plain
8. Management of water and tailings of Navchun and Darehazar mine
9. Managing the construction project of Kerman, Rafsanjan and Shahrbabak stadiums
10. Feasibility studies of copper downstream industries
11. Seismic studies, rock mechanics and geotechnics of Darezar concentrator factory
12. Update of underground water studies of Khatunabad plain and Shahrbabak plain
13. Persian Gulf water transmission line and pumping station

1. Upgrading the tailings drainage and water supply system of Midok Copper
2. Studies of water resources and tailings accumulation of Aliabad copper mine
3. Studies of the second phase of Sarchesheme copper concentration development
4. High-level and workshop supervision of the Midok Sedimentation Dam (continuation of 8501)
5. Location studies of Songun copper leaching plant construction project
6. National Administrative and Commercial Tower of Iran’s Copper Industries
7. Water and tailings management of Chelkore mine in Zahedan
8. Copper slag concentrate water and waste management
9. Management of water and tailings of Dareh Alu mine
10. Conducting meteorology and hydrology studies in the area of mines and concentrate factories of Chafirozeh and Ijo
11. Construction of Kerman Stadium
12. Continuation of the water master plan of Sarcheshme Copper Complex, Dere Zar, Shahrbabak, Daralo
13. Improvement of the main water supply network of Sarcheshme copper complex