Geotechnical Studies of DareZar copper Concentrator Plant

Project: Geotechnical Studies of DareZar copper Concentrator Plant 

Client: National Iranian Copper Industries Company

Background: Separately, NICICo planned to develop the new Dareh Zar Copper Mine and construct a 10.5 MTPA concentrator plant. Geological and geotechnical investigations for the proposed plant site were awarded to MEWE, which carried out the studies in joint venture with PayJu Iran Company.

Actions: The program included drilling 15 geotechnical boreholes, ranging from 14 to 70 meters deep, totaling 480 meters, over a 16-hectare area. Both in-situ and laboratory tests were conducted, including uniaxial and triaxial compression, point load, direct shear, and tensile strength tests. Geophysical surveys and data analysis were also completed.

Results: The studies provided detailed assessments of engineering geology, hydrogeology, seismicity, and slope stability for the site, along with guidelines for concrete foundation design. The maximum design earthquake acceleration for the region was determined to be 0.28 g.

Iran National Copper Industries Company

1. Upgrading the tailings drainage and water supply system of Sarcheshme Copper
2. Field monitoring and measurement of tailings movement in Midok
3. Hydrographic operation of Sarcheshme tailings dam reservoir
4. Improvement of concrete cover of coarse soil storage
5. As Built maps of the water supply system
6. Control and monitoring of water master plan plants
7. Groundwater studies of Khatunabad plain
8. Management of water and tailings of Navchun and Darehazar mine
9. Managing the construction project of Kerman, Rafsanjan and Shahrbabak stadiums
10. Feasibility studies of copper downstream industries
11. Seismic studies, rock mechanics and geotechnics of Darezar concentrator factory
12. Update of underground water studies of Khatunabad plain and Shahrbabak plain
13. Persian Gulf water transmission line and pumping station

1. Upgrading the tailings drainage and water supply system of Midok Copper
2. Studies of water resources and tailings accumulation of Aliabad copper mine
3. Studies of the second phase of Sarchesheme copper concentration development
4. High-level and workshop supervision of the Midok Sedimentation Dam (continuation of 8501)
5. Location studies of Songun copper leaching plant construction project
6. National Administrative and Commercial Tower of Iran’s Copper Industries
7. Water and tailings management of Chelkore mine in Zahedan
8. Copper slag concentrate water and waste management
9. Management of water and tailings of Dareh Alu mine
10. Conducting meteorology and hydrology studies in the area of mines and concentrate factories of Chafirozeh and Ijo
11. Construction of Kerman Stadium
12. Continuation of the water master plan of Sarcheshme Copper Complex, Dere Zar, Shahrbabak, Daralo
13. Improvement of the main water supply network of Sarcheshme copper complex