Chehl Koure copper mine has the capacity to produce 14 tons of dry tailings per hour. To accumulate
This amount of tailings during the 14-year life of the mine requires a place that, in terms of location, is the route
Access, site development, slope and environmental issues should be in a favorable condition.
Consulting services include locating, estimating the capacity of the dry tailings, designing the storage area,
The method of accumulation and density of dry tailings and the design of the access route from the water intake site.
The preliminary plans were prepared at the end of 2011 to the beginning of 2012 and handed over to the respected employer.
became Due to the employer’s decision to reduce project costs at the end of 2013, the drawings were removed
It was edited and resubmitted based on his points of view.