FA

Middle East Water and Environment Consulting Engineers Company

Since its formation, Middle East Water and Environmental Consulting Engineers has been able to collaborate with foreign partner companies on various projects. During this period of activity, cooperation was made with the companies of the countries on the four continents of the world except Africa. These collaborations were all in the form of projects inside Iran. The choice of the term “Middle East” is inspired by the desire to develop the company’s labor market at the level of Middle Eastern countries.

Clear Water
for
Clean Environment

History

Middle East Water and Environment consulting engineers was established in July 2004. The founders and shareholders of MEWE were the previous Water Research Center (affiliated with the Iranian Ministry of Energy) management team. They organized the present company based on the government’s policy of invoking specialized private firms in the field of water engineering. In the beginning, activities were mostly focused on the studies and designs in the field of water and tailings management in the mines.

Policy

At MEWE, we believe that “client satisfaction” and “continual progress” are measures of success that secure the survival, growth, and profitability of the company. Among the company privileges are the last responses to the client. prompt and easy relations with overseas partner companies and providing clients with useful and orderly deliverables. In MEWE. well trained, specialists and experienced human resources are considered as the company’s most valuable capital.
 
 
 

Our Organization

MEWE organization chart is simple and project-oriented. The managing board is fully involved in the company’s everyday activities. Technical and Countenance managers work as deputies of the Managing Director. The project managers have key roles in the executive procedures of the company. Quality assurance, quality control, and implementation of different management systems through “Management Systems and “Quality Control” offices acting under the Managing Director and his Technical Deputy.

Company Key Personal

At present, the number of MEWE staff is over 200 people, comprised of 95 engineers, 30 technicians, 20 administrative staff, and 5 company board members, working in different central offices in Tehran and project construction sites.

Projects

Some of the completed and ongoing projects

The clients that have trusted us

MEWE's Activities in Overview

0
Total number of projects
0
Current projects
0
Completed projects
  • Home

    November 2004

    National Copper Industries of Iran

    Upgrading the tailings drainage and water supply system of Sarcheshme Copper
  • Home

    December 2004

    National Copper Industries of Iran

    Hydrographic operation of Sarcheshme tailings dam reservoir
  • Home

    March 2004

    Chamran University of Ahvaz (Imran)

    Setting up the shape measuring device with sediment bed and designing and building the interface system
  • Home

    March 2004

    Designing and supervising the implementation of waste concentrators with fine paste
  • Home

    March 2004

    Designing and supervision of the implementation of the gravel dam
Iran National Copper Industries Company

1. Upgrading the tailings drainage and water supply system of Sarcheshme Copper
2. Field monitoring and measurement of tailings movement in Midok
3. Hydrographic operation of Sarcheshme tailings dam reservoir
4. Improvement of concrete cover of coarse soil storage
5. As Built maps of the water supply system
6. Control and monitoring of water master plan plants
7. Groundwater studies of Khatunabad plain
8. Management of water and tailings of Navchun and Darehazar mine
9. Managing the construction project of Kerman, Rafsanjan and Shahrbabak stadiums
10. Feasibility studies of copper downstream industries
11. Seismic studies, rock mechanics and geotechnics of Darezar concentrator factory
12. Update of underground water studies of Khatunabad plain and Shahrbabak plain
13. Persian Gulf water transmission line and pumping station

1. Upgrading the tailings drainage and water supply system of Midok Copper
2. Studies of water resources and tailings accumulation of Aliabad copper mine
3. Studies of the second phase of Sarchesheme copper concentration development
4. High-level and workshop supervision of the Midok Sedimentation Dam (continuation of 8501)
5. Location studies of Songun copper leaching plant construction project
6. National Administrative and Commercial Tower of Iran’s Copper Industries
7. Water and tailings management of Chelkore mine in Zahedan
8. Copper slag concentrate water and waste management
9. Management of water and tailings of Dareh Alu mine
10. Conducting meteorology and hydrology studies in the area of mines and concentrate factories of Chafirozeh and Ijo
11. Construction of Kerman Stadium
12. Continuation of the water master plan of Sarcheshme Copper Complex, Dere Zar, Shahrbabak, Daralo
13. Improvement of the main water supply network of Sarcheshme copper complex