Middle East Water and Environment Consulting Engineers Company
Since its formation, Middle East Water and Environmental Consulting Engineers has been able to collaborate with foreign partner companies on various projects. During this period of activity, cooperation was made with the companies of the countries on the four continents of the world except Africa. These collaborations were all in the form of projects inside Iran. The choice of the term “Middle East” is inspired by the desire to develop the company’s labor market at the level of Middle Eastern countries.
Clear Water
for
Clean Environment
History
Middle East Water and Environment consulting engineers was established in July 2004. The founders and shareholders of MEWE were the previous Water Research Center (affiliated with the Iranian Ministry of Energy) management team. They organized the present company based on the government’s policy of invoking specialized private firms in the field of water engineering. In the beginning, activities were mostly focused on the studies and designs in the field of water and tailings management in the mines.
Policy
Our Organization
Company Key Personal
Projects
Some of the completed and ongoing projects
Construction of a desalination plant with a capacity of 200,000 cubic meters per day in Bandar Abbas
Location studies for the construction of a processing plant and a tailings storage facility for the Golden Salez project.
Feasibility studies of monitoring and activation of semi-interested projects of mining industries
Basic studies and design of tailings accumulation of Saqoz gold processing project
The project of updating groundwater studies of Khatunabad and Shahrbabak plains
Workshop supervision and improvement of the existing apron and taxiway of the new terminal communication road
Engineering design of wastewater treatment plant of Ardakan steel factory
The clients that have trusted us
MEWE's Activities in Overview
-
November 2004
National Copper Industries of Iran
Upgrading the tailings drainage and water supply system of Sarcheshme Copper -
December 2004
National Copper Industries of Iran
Hydrographic operation of Sarcheshme tailings dam reservoir -
March 2004
Chamran University of Ahvaz (Imran)
Setting up the shape measuring device with sediment bed and designing and building the interface system -
March 2004
Designing and supervising the implementation of waste concentrators with fine paste -
March 2004
Designing and supervision of the implementation of the gravel dam
-
2005
Ports and Maritime Organization
Marine measurements in Shahid Beheshti port of Chabahar -
2005
Evaluation of the mineral water factory site -
August 2005
National Copper Industries of Iran
Plans such as the construction of Midok copper complex -
November 2005
Environmental measurements in Shahid Beheshti port of Chabahar -
November 2005
Application course in GIS coastal and port engineering studies -
November 2005
Feasibility studies of drinking and industry water supply and transfer project in Kerman province -
November 2005
Designing the control and monitoring system of water plants of Sarcheshme copper complex -
November 2005
Increasing the height of the sediment trap dam of Sarcheshme copper complex
-
April 2006
National Copper Industries of Iran
Upgrading the tailings storage system and water management of Midok copper complex. -
2006
Mahan airways
Designing and supervising the implementation of the hangar repair and maintenance of wide body aircraft -
2006
Holding a training course on the development of one-dimensional and two-dimensional mathematical models of river and sea hydraulics -
2006
Designing and supervising the upgrading of the water circulation system of Sarcheshme copper complex -
2006
Designing and supervising the implementation and improvement of the drinking water station, sanitary sewage treatment, etc -
2006
Designing and supervising the implementation and improvement of the drinking water station, sanitary sewage treatment, etc -
2006
Groundwater studies of Shahrbabak and Khatunabad plains
-
2007
Sadra University
Design studies of the first stage of Sadra University -
2007
Constructors
Studies on the design of construction of sweet water by reverse osmosis method -
2007
National Copper Industries of Iran
Location of the tailings dam for the third phase of the development of Sarcheshme copper mine -
2007
Tehran Refinery
Supervision of the implementation of the composite facade of the central office building in Mehrabad Airport -
2007
Location of tailings dam of Taft copper mines -
2007
Designing and supervising the implementation of the pumping station and water return system of Sarchesheme copper complex -
2007
Design of catering complex in Mashhad airport -
2007
Designing and supervising the implementation of the asphalt core water dam on the Rafsanjan River -
2007
The implementation of the geomembrane layer in the improvement of the sediment dam of Sarcheshmeh copper complex in Kerman -
2007
Designing and supervising the implementation of the pumping station
-
2008
Reconstruction of existing thickeners and construction of new thickeners -
2008
Studying and reviewing designs for desalination of 0444 cubic meters per day -
2008
Preparing a map of the area of Tehran oil refinery -
2008
Designing the building of an airplane simulator -
2008
Studies on the construction of sweet water in Qeshm Island -
2008
Feasibility studies of the water supply project to the cities of Sistan -
2008
Feasibility studies of Shahmirzad Bagh Gardavi four-star hotel
-
2009
Replacing the stone inside the shrine of Seyyed al-Shohada (AS) -
2009
Replacing the stone inside the shrine of Seyyed al-Shohada (AS) -
2009
Feasibility studies for the construction of a tomato paste factory in Jiroft -
2009
Studies on water supply and optimization of water consumption at Assalouye power plant
-
2011
011 cubic meters of sweet water per day of Hyosung Company -
2011
Design and engineering of twin commercial office towers of copper company, Tehran -
2011
Designing and engineering and supervising the implementation of Kerman Airport flight training center complex -
2011
Water resources studies of Tehran Park project
-
2014
Designing and supervising the execution of building number 3 of Kerman Airport flight training center complex -
2014
Designing and supervising the execution of Mahan catering buildings and Boeing Hawaiian restaurant -
2014
Seismicity, rock mechanics and geotechnical studies of the construction site of Dareh Zar copper concentration plant
-
2016
Copper processing of bright flat dome
Basic studies of the tailings dam of Takht Gonbad copper mine -
2016
Engineering design of industrial slaughterhouse and mortuary - Khorramabad -
2016
Engineering design of Ava Traditional Hotel - Yazd -
2016
Hormozgan Rural Water and Wastewater Company
Water supply studies of three rural complexes of Dehtal-Bastak, Goran (West Qeshm) and Turgan Qeshm
-
2018
Ports and Maritime Organization
Feasibility studies for the construction of a radial tire production plant -
2018
Basic studies and design of tailings accumulation of turpentine gold processing project -
2018
Site location studies of Petrosh Yemiyeh Amenen and Vanelli Nombershot Viry Rose water in his objects -
2018
Hydrology and hydrogeology studies of Qalqele gold mine area
-
2019
Investigation and study of raw water supply for desalination 0666 cubic meters per day -
2019
The project of updating underground water studies of Khatunabad and Shahrbabak plains -
2019
Completion of the construction of the 30,000-seat Shohada Mes Kerman stadium -
2019
Hydrology and hydrogeology studies of Qalqele gold mine area -
2019
Study of the foundation and design of the reservoir (dam) of Abbas Abad copper mine tailings processing plant
-
2021
Ban pumping station and water transmission line to Midok complex -
2021
Engineering design of wastewater treatment plant of Ardakan steel factory -
2021
Comprehensive studies on the supply of raw water required by the Abbasabad copper mine processing plant -
2021
Hydrology studies of the non-industrial part of the Midok phase concentration project
-
2022
Construction of desalination plant with a capacity of 200,000 cubic meters per day in Abbas Bandar (third phase) -
2022
Feasibility studies of monitoring and activation of semi-interested mining industry projects -
2022
Basic studies, location of processing plant, tailings accumulation, conceptual design and evaluation studies