Projects & Services

NICICo New Office Tower

Project: NICICo New Office Tower

Client: National Iranian Copper Industries Company

Background: NICICo was evaluating two options for its Tehran headquarters: renovating its existing building or constructing a new one. For the new construction option, MEWE was appointed to carry out the Conceptual Design phase. The work was undertaken by a joint venture between MEWE and the German architectural firm KDA.

Actions: The proposed concept featured a twin-tower design with copper louvres, symbolizing the company’s core product. The architectural inspiration was drawn from the traditional Iranian bazaar, with a commercial sector occupying the first three floors, arranged around a central courtyard. Above this, two high-rise towers were aligned along a south-to-north axis. The twin-tower layout also reflected the client’s intention to allocate part of the space to private-sector businesses.

Results: The lamellar façade structure provided effective noise protection. A cantilevered auditorium was designed for improved sightlines and convenient public access. Motorized louvres were incorporated at the upper levels, equipped with solar panels capable of rotating to track the sun, combining both energy efficiency and dynamic façade aesthetics.

Iran National Copper Industries Company

1. Upgrading the tailings drainage and water supply system of Sarcheshme Copper
2. Field monitoring and measurement of tailings movement in Midok
3. Hydrographic operation of Sarcheshme tailings dam reservoir
4. Improvement of concrete cover of coarse soil storage
5. As Built maps of the water supply system
6. Control and monitoring of water master plan plants
7. Groundwater studies of Khatunabad plain
8. Management of water and tailings of Navchun and Darehazar mine
9. Managing the construction project of Kerman, Rafsanjan and Shahrbabak stadiums
10. Feasibility studies of copper downstream industries
11. Seismic studies, rock mechanics and geotechnics of Darezar concentrator factory
12. Update of underground water studies of Khatunabad plain and Shahrbabak plain
13. Persian Gulf water transmission line and pumping station

1. Upgrading the tailings drainage and water supply system of Midok Copper
2. Studies of water resources and tailings accumulation of Aliabad copper mine
3. Studies of the second phase of Sarchesheme copper concentration development
4. High-level and workshop supervision of the Midok Sedimentation Dam (continuation of 8501)
5. Location studies of Songun copper leaching plant construction project
6. National Administrative and Commercial Tower of Iran’s Copper Industries
7. Water and tailings management of Chelkore mine in Zahedan
8. Copper slag concentrate water and waste management
9. Management of water and tailings of Dareh Alu mine
10. Conducting meteorology and hydrology studies in the area of mines and concentrate factories of Chafirozeh and Ijo
11. Construction of Kerman Stadium
12. Continuation of the water master plan of Sarcheshme Copper Complex, Dere Zar, Shahrbabak, Daralo
13. Improvement of the main water supply network of Sarcheshme copper complex