Study of the foundation and design of the impoundment (dam) of Abbas Abad copper mine tailings processing plant

Abbas Abad copper mine as a study area in the northeast of Iran in the middle of the road to Shahrood

Sabzevar is located. The amount of production waste is 0442 and the water consumption of the factory is 0402 cubic meters per day.

Currently, in this mine, tailings are left in the form of slurry and accumulated behind the earthen dam. At

This project will first conduct basic studies and then based on the results of the basic model, dry mass or

The tailings dam will be proposed and designed taking into account the arrangements and requirements.

Basic studies include meteorological studies of the project scope such as precipitation, temperature, evaporation, humidity, wind and so on

Ice days, hydrology and surface water flow studies, including the characteristics of the catchment area,

monthly and annual potential of surface currents in the region, Determination of floods with return periods
Various and investigation of the condition of the waterways leading to the area of ​​the reservoir and including geological studies
Investigating the strength and permeability of the bedrock in the storage area.
In the design section, first, different sediment concentration methods are examined and the optimal option is selected
will be selected. The optimal method will be selected from among the existing waste accumulation methods. Designing
Accumulation includes determination of mass body volume, dimensional specifications and its execution method. Then the method
Transfer, emptying and accumulation of waste will be investigated. The network for collecting and transporting contaminated surface water and Non-contaminated upstream of the reservoir, auxiliary facilities and the collection tank of polluted water and the transmission system
The return of water to the processing cycle will be designed. Also environmental measures to prevent
It will take into account the leakage and pollution of surface and underground water in the Abbas Abad copper mine project
became.

Iran National Copper Industries Company

1. Upgrading the tailings drainage and water supply system of Sarcheshme Copper
2. Field monitoring and measurement of tailings movement in Midok
3. Hydrographic operation of Sarcheshme tailings dam reservoir
4. Improvement of concrete cover of coarse soil storage
5. As Built maps of the water supply system
6. Control and monitoring of water master plan plants
7. Groundwater studies of Khatunabad plain
8. Management of water and tailings of Navchun and Darehazar mine
9. Managing the construction project of Kerman, Rafsanjan and Shahrbabak stadiums
10. Feasibility studies of copper downstream industries
11. Seismic studies, rock mechanics and geotechnics of Darezar concentrator factory
12. Update of underground water studies of Khatunabad plain and Shahrbabak plain
13. Persian Gulf water transmission line and pumping station

1. Upgrading the tailings drainage and water supply system of Midok Copper
2. Studies of water resources and tailings accumulation of Aliabad copper mine
3. Studies of the second phase of Sarchesheme copper concentration development
4. High-level and workshop supervision of the Midok Sedimentation Dam (continuation of 8501)
5. Location studies of Songun copper leaching plant construction project
6. National Administrative and Commercial Tower of Iran’s Copper Industries
7. Water and tailings management of Chelkore mine in Zahedan
8. Copper slag concentrate water and waste management
9. Management of water and tailings of Dareh Alu mine
10. Conducting meteorology and hydrology studies in the area of mines and concentrate factories of Chafirozeh and Ijo
11. Construction of Kerman Stadium
12. Continuation of the water master plan of Sarcheshme Copper Complex, Dere Zar, Shahrbabak, Daralo
13. Improvement of the main water supply network of Sarcheshme copper complex