FA

خدمات و پروژه ها

شرکت مهندسین مشاور آب و محیط خاورمیانه

Design & Site Supervision of Ava Traditional Hotel

In these past few years the demand for construction of traditional hotels has increased in Yazd, Kashan, Isfahan and Shiraz. After Procurement of the building/property, private sectors sign a contract with consultants in order to implement the feasibility study and provide the construction drawings. In that regard a private financer bought a building related to the second Pahlavi period with the area of 700 sqm in the city of Yazd and assigned the architectural, structural retrofitting, mechanical and electrical facility drawings to MEWE. After precise studies the existing building will be transform to a traditional hotel with 30 rooms, restaurant and commercial units. Electrical segment of the project include lighting, phone and television, CCTV, electrical locking systems for rooms, automation of reception and sound system. Also mechanical design includes heating and cooling systems, water and waste water, firefighting and alarm, ventilation and modern kitchen. Currently, the study and design phases has been completed and the construction is ongoing. Also, a technical feasibility report is provided by MEWE.

Iran National Copper Industries Company

1. Upgrading the tailings drainage and water supply system of Sarcheshme Copper
2. Field monitoring and measurement of tailings movement in Midok
3. Hydrographic operation of Sarcheshme tailings dam reservoir
4. Improvement of concrete cover of coarse soil storage
5. As Built maps of the water supply system
6. Control and monitoring of water master plan plants
7. Groundwater studies of Khatunabad plain
8. Management of water and tailings of Navchun and Darehazar mine
9. Managing the construction project of Kerman, Rafsanjan and Shahrbabak stadiums
10. Feasibility studies of copper downstream industries
11. Seismic studies, rock mechanics and geotechnics of Darezar concentrator factory
12. Update of underground water studies of Khatunabad plain and Shahrbabak plain
13. Persian Gulf water transmission line and pumping station

1. Upgrading the tailings drainage and water supply system of Midok Copper
2. Studies of water resources and tailings accumulation of Aliabad copper mine
3. Studies of the second phase of Sarchesheme copper concentration development
4. High-level and workshop supervision of the Midok Sedimentation Dam (continuation of 8501)
5. Location studies of Songun copper leaching plant construction project
6. National Administrative and Commercial Tower of Iran’s Copper Industries
7. Water and tailings management of Chelkore mine in Zahedan
8. Copper slag concentrate water and waste management
9. Management of water and tailings of Dareh Alu mine
10. Conducting meteorology and hydrology studies in the area of mines and concentrate factories of Chafirozeh and Ijo
11. Construction of Kerman Stadium
12. Continuation of the water master plan of Sarcheshme Copper Complex, Dere Zar, Shahrbabak, Daralo
13. Improvement of the main water supply network of Sarcheshme copper complex